Back to Blog
Getting StartedMarch 18, 20258 min read

From Spreadsheets to Software: A Migration Guide for Small Labs

Excel spreadsheets work great when you're starting out. But as your lab grows, dedicated software becomes essential. Here's how to make the transition smoothly.

There's nothing wrong with starting on spreadsheets. They're familiar, flexible, and cost-effective for small operations. Many successful labs began tracking cultures in Excel.

But spreadsheets have limits. As you scale from dozens to hundreds of cultures, or as multiple people need simultaneous access, the cracks start to show. Recognizing when it's time to upgrade - and executing the transition effectively - can save you months of frustration.

Signs It's Time to Upgrade

You might be ready for dedicated software if you're experiencing:

Version Control Chaos

Multiple versions of the same spreadsheet floating around. Which one is current? Who has the latest updates?

Collaboration Bottlenecks

Only one person can edit at a time. Team members waiting for file access or overwriting each other's changes.

Growing Complexity

Your spreadsheet has dozens of tabs, complex formulas, and custom macros that break whenever someone opens it wrong.

Searchability Issues

Finding a specific culture means scrolling through hundreds of rows or using cumbersome filter combinations.

Data Entry Errors

Typos in culture IDs, inconsistent date formats, or accidentally deleted rows causing data loss.

Lineage Tracking Nightmares

Trying to visualize parent-child relationships across generations becomes impossibly complex.

The Tipping Point

For most labs, the transition makes sense somewhere between 100-300 active cultures, or when you add your second regular staff member. Earlier if you're growing quickly, later if growth is slow and your spreadsheet system works well.

What Software Offers That Spreadsheets Don't

Structured Relationships

Software understands parent-child connections between cultures. Viewing lineage doesn't require manual VLOOKUP formulas or separate tracking sheets.

Real-Time Collaboration

Multiple team members can work simultaneously without file locking or sync conflicts. Changes appear instantly for everyone.

Built-In Validation

Software prevents common errors. Can't accidentally delete a culture record, typo a date, or create duplicate IDs.

Mobile Access

Update records from your phone at the bench. Spreadsheets on small screens are painful to navigate and edit.

Automatic Backups

Cloud-based systems backup automatically. No more manual saves or worrying about losing data if your computer crashes.

Advanced Search

Find cultures by any field instantly. Filter by multiple criteria, search text in notes, locate specific contamination events.

Preparing for the Transition

Step 1: Clean Your Data

Before migrating, clean up your spreadsheet:

  • • Standardize date formats (pick one format and stick to it)
  • • Fix inconsistent naming (choose either "Mother Plant 1" or "MP-001", not both)
  • • Remove duplicate entries
  • • Fill in missing required fields
  • • Document any custom codes or abbreviations you use

This cleanup work pays dividends. It's easier to fix issues in your familiar spreadsheet than after importing messy data into new software.

Step 2: Map Your Data Structure

Identify what information you track and how it maps to software concepts:

Example Mapping:

Your Spreadsheet Columns:

  • • Culture ID
  • • Species
  • • Date Started
  • • Parent ID
  • • Current Stage
  • • Media Used
  • • Notes

Software Fields:

  • • Culture Code (required)
  • • Species Name (required)
  • • Initiation Date (required)
  • • Parent Culture (optional)
  • • Current Stage (dropdown)
  • • Media Batch (linked record)
  • • Observations (text area)

Step 3: Start with Active Cultures Only

Don't try to migrate your entire history immediately. Focus on currently active cultures first. You can always import historical data later if needed, or just reference your old spreadsheet for archive purposes.

Pro Tip: Parallel Running

Consider running both systems in parallel for 2-4 weeks. Update new information in the software, but keep your spreadsheet as a backup reference. Once comfortable, fully commit to the software.

The Migration Process

Data Import Options

Most lab software offers these import methods:

CSV Import

Export your spreadsheet as CSV, then import into the software. Usually includes mapping tools to match your columns to software fields.

Best for: Straightforward data with standard fields

Manual Entry

Enter records one by one. Tedious but gives you a chance to review and clean each entry. Good for familiarizing yourself with the software.

Best for: Small numbers (under 50 records) or complex data

Assisted Migration

Some vendors offer migration assistance where they help you import your data correctly.

Best for: Large datasets or unusual data structures

Verification Steps

After importing, verify your data:

  1. Check that culture counts match (did everything import?)
  2. Verify parent-child relationships are correct
  3. Spot-check a sample of records for accuracy
  4. Confirm dates formatted correctly
  5. Test search and filter functions

Training Your Team

Everyone who uses the system needs basic training. Even if the software is intuitive, people need to understand:

  • • How to find and view culture records
  • • How to create new cultures
  • • How to update existing records
  • • How to document contamination or other issues
  • • What fields are required vs optional
  • • Who to ask when they have questions

Plan for a learning curve. The first week will feel slower as everyone adjusts. By week three, most teams are faster than they were with spreadsheets.

Common Migration Challenges

Challenge: Resistance to change

Solution: Involve the team early. Let them test the software before committing. Address concerns honestly.

Challenge: Complex formulas lost

Solution: Dedicated software often has built-in features for what you were calculating manually. Identify which formulas are essential and find the software equivalent.

Challenge: Unique workflow doesn't fit

Solution: Choose software that's customizable. If your lab has specific needs, you need flexible software.

Challenge: Lost during migration

Solution: Never delete your original spreadsheet. Keep it as an archive for at least 6 months after switching.

What Success Looks Like

A successful transition means:

Team members naturally reaching for the software instead of the old spreadsheet

Data entry becoming faster than it was before

Finding information taking seconds instead of minutes

Collaboration issues disappearing

Being able to answer questions about your lab that were difficult before

Ready to Make the Switch?

MeristemLab is designed for easy adoption, with flexible customization to match your existing workflow and simple CSV import to get your data in quickly. No complex setup, no expensive consultants.

Join the Waitlist